=Fabrication Procedure=
=Fabrication Procedure=


#Prepare all required tools (complete documentation of tools used - Chris F at Factor e Farm can do this)
#Prepare all required tools (complete documentation of tools used - Chris F at Factor e Farm can do this) and workspace
##Include scalability considerations and workflow for 1 machine, then 4 machines, then continuous production (100 machines)
#Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this)
#Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this)
##Stock steel (pictures from first build are desirable here)
##Stock steel (pictures from first build are desirable here)
##Hydrauilics (complete lists already documented on wiki, need to be organized)
##Hydrauilics (complete lists already documented on wiki, need to be organized)
##Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added)
##Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added)
=Frame, Drawer, Cylinder Mount=
#Build Frame
##Document step by step. Old instructions are still relevant, older documentation should be mined.






[[Category:CEB Press Documentation]]
[[Category:CEB Press Documentation]]

Revision as of 19:57, 6 June 2011

Introduction

This marks the first epic effort at organizing CEB Documentation towards a complete fabrication procedure with all supporting materials. Several attempts have been tried over the last 3 years, none of which were ripe for success as much as this one.

Fabrication Procedure

  1. Prepare all required tools (complete documentation of tools used - Chris F at Factor e Farm can do this) and workspace
    1. Include scalability considerations and workflow for 1 machine, then 4 machines, then continuous production (100 machines)
  2. Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this)
    1. Stock steel (pictures from first build are desirable here)
    2. Hydrauilics (complete lists already documented on wiki, need to be organized)
    3. Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added)


Frame, Drawer, Cylinder Mount

  1. Build Frame
    1. Document step by step. Old instructions are still relevant, older documentation should be mined.