CEB Press Documentation: Difference between revisions
Jump to navigation
Jump to search
Line 5: | Line 5: | ||
=Fabrication Procedure= | =Fabrication Procedure= | ||
#Prepare all required tools (complete documentation of tools used - Chris F at Factor e Farm can do this) | #Prepare all required tools (complete documentation of tools used - Chris F at Factor e Farm can do this) and workspace | ||
##Include scalability considerations and workflow for 1 machine, then 4 machines, then continuous production (100 machines) | |||
#Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this) | #Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this) | ||
##Stock steel (pictures from first build are desirable here) | ##Stock steel (pictures from first build are desirable here) | ||
##Hydrauilics (complete lists already documented on wiki, need to be organized) | ##Hydrauilics (complete lists already documented on wiki, need to be organized) | ||
##Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added) | ##Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added) | ||
=Frame, Drawer, Cylinder Mount= | |||
#Build Frame | |||
##Document step by step. Old instructions are still relevant, older documentation should be mined. | |||
[[Category:CEB Press Documentation]] | [[Category:CEB Press Documentation]] |
Revision as of 19:57, 6 June 2011
Introduction
This marks the first epic effort at organizing CEB Documentation towards a complete fabrication procedure with all supporting materials. Several attempts have been tried over the last 3 years, none of which were ripe for success as much as this one.
Fabrication Procedure
- Prepare all required tools (complete documentation of tools used - Chris F at Factor e Farm can do this) and workspace
- Include scalability considerations and workflow for 1 machine, then 4 machines, then continuous production (100 machines)
- Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this)
- Stock steel (pictures from first build are desirable here)
- Hydrauilics (complete lists already documented on wiki, need to be organized)
- Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added)
Frame, Drawer, Cylinder Mount
- Build Frame
- Document step by step. Old instructions are still relevant, older documentation should be mined.