Glass Casting: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "*Here's how to melt - [https://chatgpt.com/c/68436d92-f6cc-8010-b198-3d9700292c88] *$17/sf for glass block at Menards [https://www.menards.com/main/doors-windows-millwork/wind...")
 
No edit summary
Line 1: Line 1:
*Here's how to melt - [https://chatgpt.com/c/68436d92-f6cc-8010-b198-3d9700292c88]
*Here's how to melt - [https://chatgpt.com/c/68436d92-f6cc-8010-b198-3d9700292c88]
*$17/sf for glass block at Menards [https://www.menards.com/main/doors-windows-millwork/windows/glass-blocks-glass-block-panels/glass-block-accessories/mulia-8w-x-8h-x-3d-clear-hollow-craft-and-dcor-glass-block/79000-cr/p-1462879481239-c-7686.htm]
*$17/sf for glass block at Menards [https://www.menards.com/main/doors-windows-millwork/windows/glass-blocks-glass-block-panels/glass-block-accessories/mulia-8w-x-8h-x-3d-clear-hollow-craft-and-dcor-glass-block/79000-cr/p-1462879481239-c-7686.htm] at $1.4/lb
 
=5000 lb/day System with 100kW PV System=
*Power Draw: ~60–80 kW total
*Daily Energy Use: ~800–1,000 kWh
*Cycle Time: 2.5–3 hrs including pour
*Throughput: ~10 melts/day across 2 furnaces = 6,000–8,000 lb/day potential

Revision as of 22:58, 6 June 2025

  • Here's how to melt - [1]
  • $17/sf for glass block at Menards [2] at $1.4/lb

5000 lb/day System with 100kW PV System

  • Power Draw: ~60–80 kW total
  • Daily Energy Use: ~800–1,000 kWh
  • Cycle Time: 2.5–3 hrs including pour
  • Throughput: ~10 melts/day across 2 furnaces = 6,000–8,000 lb/day potential