Glass Casting: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
 
Line 7: Line 7:
*Cycle Time: 2.5–3 hrs including pour
*Cycle Time: 2.5–3 hrs including pour
*Throughput: ~10 melts/day across 2 furnaces = 6,000–8,000 lb/day potential
*Throughput: ~10 melts/day across 2 furnaces = 6,000–8,000 lb/day potential
*Here is a 100lb melt furnace DIY for $700 instructions [https://chatgpt.com/c/68436d92-f6cc-8010-b198-3d9700292c88]. But if 8 cu ft - it can melt up to 1000 lb per melt [https://chatgpt.com/c/68436d92-f6cc-8010-b198-3d9700292c88]

Latest revision as of 23:36, 6 June 2025

  • Here's how to melt - [1]
  • $17/sf for glass block at Menards [2] at $1.4/lb

5000 lb/day System with 100kW PV System

  • Power Draw: ~60–80 kW total
  • Daily Energy Use: ~800–1,000 kWh
  • Cycle Time: 2.5–3 hrs including pour
  • Throughput: ~10 melts/day across 2 furnaces = 6,000–8,000 lb/day potential
  • Here is a 100lb melt furnace DIY for $700 instructions [3]. But if 8 cu ft - it can melt up to 1000 lb per melt [4]