=Mon Aug 4, 2025=
=Mon Aug 4, 2025=
*Header - used tiedown strap to pull in sides, as right side was 1.5" off vertical. Cut header to fit. Nailed through king stud. [https://photos.app.goo.gl/P1kSZRivyDomwHFGA]
*Header - used tiedown strap to pull in sides, as right side was 1.5" off vertical. Cut header to fit. Nailed through king stud. [https://photos.app.goo.gl/P1kSZRivyDomwHFGA]. Album - [https://photos.app.goo.gl/KE69C2NtMXvnd3Y76]


=Sat Aug 2, 2025=
=Sat Aug 2, 2025=

Latest revision as of 21:37, 4 August 2025

Work Doc

edit

Mon Aug 4, 2025

  • Header - used tiedown strap to pull in sides, as right side was 1.5" off vertical. Cut header to fit. Nailed through king stud. [1]. Album - [2]

Sat Aug 2, 2025

  • Major lessons - no mods to modules.
  • Numbered and prepared ahead of time.
  • Major block once the T caps entered - blocking was impossible so it meant drilling holes to attach blocking. And slitting the OSB, weakening shear capacity.