Max Log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 22: Line 22:


* Finished ceiling insulation in the first 2 house modules
* Finished ceiling insulation in the first 2 house modules
[[File:Ceiling insulation.jpeg|thumb|Ceiling insulation]]


* Started insulating wall modules in house module 1 with R19 fiberglass
* Started insulating wall modules in house module 1 with R19 fiberglass
[[File:Wall insulation.jpeg|thumb|Wall insulation]]


* Started taking off some of the floor level OSB strips to fill in gaps behind them with spray foam (in house module 3)
* Started taking off some of the floor level OSB strips to fill in gaps behind them with spray foam (in house module 3)


=Mon Oct 27, 2025=
=Mon Oct 27, 2025=

Revision as of 02:54, 29 October 2025

Build Pictures

Time Log

Write down morning work done, lunch time, and afternoon work done.

Tue Oct 28, 2025

Morning: 10:05am-12:45pm

  • Installed 2nd sliding door handle/lock and adjusted roller (~5min total)
  • Put up R38 fiberglass insulation into the ceiling, covered about 5 rows

Lunch: 12:45pm-1:45pm

Afternoon: 1:45pm-5:15pm

  • Sealed cracks & gaps between wall modules & rafters/taper with spray foam
  • Finished ceiling insulation in the first 2 house modules
Ceiling insulation
  • Started insulating wall modules in house module 1 with R19 fiberglass
Wall insulation
  • Started taking off some of the floor level OSB strips to fill in gaps behind them with spray foam (in house module 3)

Mon Oct 27, 2025

Morning: 10:05am-2:30pm

  • Helped attach roof rafter braces
  • Started attaching some PV panels

Lunch: 2:30pm-3:30pm

Afternoon: 3:30pm-6:20pm

  • Measured out PV spacing on most runners
  • Attached front PV mounts on most runners
  • Finished installing first row of PV panels


Evening (non-work):

  • Spent 2h after work learning/trying out FreeCAD 1.0