May Production Plan: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "Strategy: *List steps in order of duty – Power Cube to Tractor to CEB press *Assess capacity required *Allocate tasks to 6 fabricators and local shop *List risks and recovery ...")
 
Line 9: Line 9:
=Power Cube Tasks=
=Power Cube Tasks=


Shake Down Motor Size
'''Shake Down Motor Size'''


*Measure Power Cube and location of mount
*Start with Power Cube mounting. Measure Power Cube and location of mount
*[2] Cut Mount – 1/4x4 by appropriate measurement
*[2] Cut Mount – 1/4x4 by appropriate measurement
*[2] Drill Mounts – 2 holes on ends each
*[2] Drill Mounts – 2 holes on ends each
*Transfer punch mount hole locations
*Transfer punch mount hole locations for top and bottom mount
*Mag drill holes in frame
*Mark mount hole locations on other side of beams
*
*Weld Mount eye on bottom of Power Cube
*Prepare Power Cube Mount
*Weld mount eye on bottom Power Cube Mount
*Mag drill holes in frame -
*Mount Power Cube on Tractor
*Mount Power Cube on Tractor
Build Hydraulic tank
 
'''Build Hydraulic tank'''


*Grind tanks down to clean
*Grind tanks down to clean

Revision as of 13:47, 16 June 2011

Strategy:

  • List steps in order of duty – Power Cube to Tractor to CEB press
  • Assess capacity required
  • Allocate tasks to 6 fabricators and local shop
  • List risks and recovery plans
  • Assess daily, before and after workday

Power Cube Tasks

Shake Down Motor Size

  • Start with Power Cube mounting. Measure Power Cube and location of mount
  • [2] Cut Mount – 1/4x4 by appropriate measurement
  • [2] Drill Mounts – 2 holes on ends each
  • Transfer punch mount hole locations for top and bottom mount
  • Mark mount hole locations on other side of beams
  • Weld Mount eye on bottom of Power Cube
  • Weld mount eye on bottom Power Cube Mount
  • Mag drill holes in frame -
  • Mount Power Cube on Tractor

Build Hydraulic tank

  • Grind tanks down to clean
  • Clean edges and bungs
  • Ream any necessary holes
  • Lay out 3 sets on welding table
  • Close off bungs with fittings
  • Tack everything
  • Weld
  • Assemble