(Created page with "Strategy: *List steps in order of duty – Power Cube to Tractor to CEB press *Assess capacity required *Allocate tasks to 6 fabricators and local shop *List risks and recovery ...") |
|||
Line 9: | Line 9: | ||
=Power Cube Tasks= | =Power Cube Tasks= | ||
Shake Down Motor Size | '''Shake Down Motor Size''' | ||
*Measure Power Cube and location of mount | *Start with Power Cube mounting. Measure Power Cube and location of mount | ||
*[2] Cut Mount – 1/4x4 by appropriate measurement | *[2] Cut Mount – 1/4x4 by appropriate measurement | ||
*[2] Drill Mounts – 2 holes on ends each | *[2] Drill Mounts – 2 holes on ends each | ||
*Transfer punch mount hole locations | *Transfer punch mount hole locations for top and bottom mount | ||
* | *Mark mount hole locations on other side of beams | ||
* | *Weld Mount eye on bottom of Power Cube | ||
* | *Weld mount eye on bottom Power Cube Mount | ||
*Mag drill holes in frame - | |||
*Mount Power Cube on Tractor | *Mount Power Cube on Tractor | ||
Build Hydraulic tank | |||
'''Build Hydraulic tank''' | |||
*Grind tanks down to clean | *Grind tanks down to clean |
Revision as of 13:47, 16 June 2011
Strategy:
- List steps in order of duty – Power Cube to Tractor to CEB press
- Assess capacity required
- Allocate tasks to 6 fabricators and local shop
- List risks and recovery plans
- Assess daily, before and after workday
Power Cube Tasks
Shake Down Motor Size
- Start with Power Cube mounting. Measure Power Cube and location of mount
- [2] Cut Mount – 1/4x4 by appropriate measurement
- [2] Drill Mounts – 2 holes on ends each
- Transfer punch mount hole locations for top and bottom mount
- Mark mount hole locations on other side of beams
- Weld Mount eye on bottom of Power Cube
- Weld mount eye on bottom Power Cube Mount
- Mag drill holes in frame -
- Mount Power Cube on Tractor
Build Hydraulic tank
- Grind tanks down to clean
- Clean edges and bungs
- Ream any necessary holes
- Lay out 3 sets on welding table
- Close off bungs with fittings
- Tack everything
- Weld
- Assemble