Fabrication Procedure Standards: Difference between revisions
Line 11: | Line 11: | ||
*Written, step-by-step procedure | *Written, step-by-step procedure | ||
*5-30 second | *5-30 second conceptual animation of the step using modeling software (Sketchup, Blender, professional CAD package such as Solidworks or AutoCAD) | ||
*5-30 second CAE animations (motion, stress, thermal properties, magnetic fields, flows, etc) | |||
For the purpose of evolving the material in a distributed collaborative fashion, commits to the Fabrication Procedure repository should include source files for: | |||
*All CAD documentation (2D, 3D, circuit diagrams) | |||
*CAM toolpaths | |||
*CAE files | |||
*All animation sequences | |||
*Video edit files with source material (Kdenlive, Final Cut, iMovie, etc.) | |||
* | |||
[[Category:Standards]] | [[Category:Standards]] |
Revision as of 12:23, 18 June 2011
Introduction
We aim to set unprecedented standards of quality for documenting fabrication procedures for economically significant products related to Distributive Economics. To this end, we are setting a standard for documenting each step of a given fabrication procedure. Each step is defined as a small breakdown of a complete fabrication procedure, where each device such as the open source tractor would have on the order of 100 steps, and where each step is broken down to further sub-steps. The aim is to enable an individual with no prior experience to follow directions completely and succeed at completing a build.
This is relevant for one-at-a-time replication of OSE products, but it is even more important for successful implementation of the Distributive Economics business model. One way of implementing the Distributive Economics business model within a scalable, bootstrapping, low-capitalization enterprise is to leverage the labor of unskilled individuals via a volunteer-based, training-for-labor exchange. The trainer benefits from the value of the trainees' labor, and the trainee benefits from gaining powerful skills of production. Essentially, significant value can be generated by the trainer as unskilled individuals are trained rapidly, via prior study of the Fabrication Procedure (as defined herein) and by hands-on training. This works effectively if such training materials are available for study prior to the hands-on work - which is the reason behind creating high quality, exhaustive documentation.
The benefit to the trainee are rapid learning of state-of-art, OSE Spec techniques - without barriers based on lack of skill. Our experience at Factor e Farm has been transformative in this respect. We've observed a number of unskilled individuals reconnect to their power of making things - revealing new levels of satisfaction from attaining this basic human capacity. For example, complete novices have helped substantially in the May 2011 production run of tractors and CEB presses.
Fabrication Documentation Standards
The fabrication procedure proper should contain the following for the steps and substeps:
- Written, step-by-step procedure
- 5-30 second conceptual animation of the step using modeling software (Sketchup, Blender, professional CAD package such as Solidworks or AutoCAD)
- 5-30 second CAE animations (motion, stress, thermal properties, magnetic fields, flows, etc)
For the purpose of evolving the material in a distributed collaborative fashion, commits to the Fabrication Procedure repository should include source files for:
- All CAD documentation (2D, 3D, circuit diagrams)
- CAM toolpaths
- CAE files
- All animation sequences
- Video edit files with source material (Kdenlive, Final Cut, iMovie, etc.)