1000 House Modules Techniques: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 3: Line 3:
*use green laser for horizontal lines.
*use green laser for horizontal lines.
*Do every ridge, and 4' vertical distance
*Do every ridge, and 4' vertical distance
=Cutting=
*Set angle and depth of cordless circular saw for PV mount cuts

Revision as of 19:20, 24 December 2025

Metal Roof and Siding

  • Take stack, predrill all holes on ridges. Saves 2-4x install time.
  • use green laser for horizontal lines.
  • Do every ridge, and 4' vertical distance

Cutting

  • Set angle and depth of cordless circular saw for PV mount cuts