Seed Eco-Home 4 Documentation: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 11: Line 11:
**Working Doc Part 7 - Utility Wall, Trim, Paint. Final Wire Routing Map.
**Working Doc Part 7 - Utility Wall, Trim, Paint. Final Wire Routing Map.
**Working Doc Part 8 - Cabinets, Water Heaters, Flooring, Garage Door Installation, Shelves, Final Water and Plumbing
**Working Doc Part 8 - Cabinets, Water Heaters, Flooring, Garage Door Installation, Shelves, Final Water and Plumbing
*Original engineering drawings from a structural engineer - .  
*Original engineering drawings from a structural engineer - [[Construction_Plan_Check_Document]].  
*The overall documentation is found at  [[Seed Eco-Home 4]].  
*The overall documentation is found at  [[Seed Eco-Home 4]].  
*More information is found at [[Seed Eco-Home 2]], which was the prototype prior to Seed Eco-Home (a production build).
*More information is found at [[Seed Eco-Home 2]], which was the prototype prior to Seed Eco-Home (a production build).

Revision as of 01:15, 11 April 2026

  • The full CAD assembly file in FreeCAD - https://drive.google.com/file/d/144Nv-Esxe3_kN4BwLTOm7HYDOBJqvu0S/view
  • Individual modules in FreeCAD including utilities (water, plumbing, outlets, electrical system, PV system, and more) , where the utilities are not in the full CAD assembly file above - Seed Eco-Home 4 3D CAD
  • The bill of materials, at $60k - https://docs.google.com/spreadsheets/d/1gdLj8JvYkAdIkUwGFVTFmwaP_HZ9aqMLucWQEEtCTTk/edit?gid=974819817#gid=974819817
  • 1000 pages of build details
    • Working Doc Part 1 - Garage, Roof, Runners + PV Mounting -
    • Working Doc Part 2 - Foundation Skirt, Doors, Trim, Vinyl, Trellis Drop. Roping technique.
    • Working Doc Part 3 - PV Design, Service Entrance, Module Generators, and Plumbing + PEX Subassemblies, Apertures
    • Working Doc Part 4 - Water Supply vBOM. Module map. PEX + Plumbing vBOM. Hardscape. Electrical.
    • Working Doc Part 5 - Power Wall. Power Center Finishing. Utilities, Driveway, Heat Pump
    • Working Doc Part 6 - PV Combiner. DC Disconnect. Transfer Switch. Interior. Wood filler. Flooring.
    • Working Doc Part 7 - Utility Wall, Trim, Paint. Final Wire Routing Map.
    • Working Doc Part 8 - Cabinets, Water Heaters, Flooring, Garage Door Installation, Shelves, Final Water and Plumbing
  • Original engineering drawings from a structural engineer - Construction_Plan_Check_Document.
  • The overall documentation is found at Seed Eco-Home 4.
  • More information is found at Seed Eco-Home 2, which was the prototype prior to Seed Eco-Home (a production build).