PV Array Design: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 4: Line 4:
*Provide panel dimensions like for example https://wiki.opensourceecology.org/wiki/File:Adani2.png - and ask AI how many can fit in the N-S direction according to the [[PV Runner Schema]]. Provide a JPG image for the AI to parse the schema.
*Provide panel dimensions like for example https://wiki.opensourceecology.org/wiki/File:Adani2.png - and ask AI how many can fit in the N-S direction according to the [[PV Runner Schema]]. Provide a JPG image for the AI to parse the schema.
*For example, if 11 can fit, and string design involves 8 panels (such as 4 strings of 2 panels each), then use 8 panels per sting to simplify the wiring.
*For example, if 11 can fit, and string design involves 8 panels (such as 4 strings of 2 panels each), then use 8 panels per sting to simplify the wiring.
*If an inverter has For example, say 22A rating per srting, and each string is 9A - means you can combine 2 strings in parallel for 18A total, which is within the 22A rating.
*Depending on the output of [[Determining String Design for an Inverter]] - locate the inverter closest to all the strings.
*Locate inverters on opposite sides of workshop (N and S) to minimize wire lengths. Operate

Revision as of 00:13, 13 April 2026