CEB Press/Manufacturing Instructions/Sensor Unit: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 28: Line 28:


== Fabrication Steps ==
== Fabrication Steps ==
# cut telephone cable 70" long
# strip shielding plastic 1.5" and 8" at either end
# solder hall effects sensor

Revision as of 02:57, 21 August 2011

Main > Housing and construction > CEB Press > CEB press building instructions

Main-cyl-sensor.jpg


Tools Required

solder iron heat gun wire cutter/stripper lighter

Materials Required

hall effects sensor 1/2" poly pipe 5/8" o.d. underground telephone cable 4 wire potting compound disposable mixing cups tape cat5 cable shrink wrap

Diagrams

Fabrication Steps

  1. cut telephone cable 70" long
  2. strip shielding plastic 1.5" and 8" at either end
  3. solder hall effects sensor