CEB Press/Manufacturing Instructions/Sensor Unit: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 13: Line 13:
== Materials Required ==
== Materials Required ==


hall effects sensor
*hall effects sensor
1/2" poly pipe 5/8" o.d.
*1/2" poly pipe 5/8" o.d.
underground telephone cable 4 wire
*underground telephone cable 4 wire
potting compound
*potting compound
disposable mixing cups
*disposable mixing cups
tape
*tape
cat5 cable
*cat5 cable
shrink wrap
*shrink wrap


== Diagrams ==
== Diagrams ==

Revision as of 05:29, 5 September 2011

Main > Housing and construction > CEB Press > CEB press building instructions

Main-cyl-sensor.jpg


Tools Required

  • solder iron
  • heat gun
  • wire cutter/stripper
  • lighter

Materials Required

  • hall effects sensor
  • 1/2" poly pipe 5/8" o.d.
  • underground telephone cable 4 wire
  • potting compound
  • disposable mixing cups
  • tape
  • cat5 cable
  • shrink wrap

Diagrams

Fabrication Steps

  1. cut telephone cable 70" long
  2. strip shielding plastic 1.5" and 8" at either end
  3. solder hall effects sensor