Jan 26th: Complete boiler research: Feed Pump, Montotube coil winding jig, safety valve. Finish brick laying in shop. Finish steam engine proposal. Misc: Debit card activation, skype account, Explorer showing. Time Organization program: Need linked in program. Jan 27th: Complete Steam pump and Lathe BOM post and post steam engine proposal.
Frame inside of Shop kitchen.
Jan 28th: Get quote of materials from Sweigers: Insulate shop and get sheet rock.
Jan 29th: Order steam engine and lathe materials. Post final dwgs of mechanical engine, boiler, and layout. Jan 30th: Research steam engine solenoid specs, post and locate. Sheet rock shop space, drill in shower outlet fire boiler. Jan 30th: Work on shop try to get liveable cookeable space.
Feb 1st: Rest
Feb 2nd: Begin steam engine work upon reciveing materials:
1 week Boiler and auxilaries, safety valve, feed pumps, draft control.
2nd week February: Engine construction. Bore cylinder set piston rings, assemble stuffing box,
3rd week of February: Lower Crank Assembly, fire up system possibly by the end of the week.