==Concrete Work==
==Concrete Work==
===Insulated Outside Wall Support Slabs
We are planning to put concrete the full 3' width of the Column Support Pads all the way around the outside of the building. They will be 3-1/2" (2x4 lumber size) deep and will support the two CEB walls that enclose the hay bale insulation.


===Narrow Wall Support Slabs===
===Narrow Wall Support Slabs===

Revision as of 16:47, 30 September 2011

The need for all-weather housing to shelter year-round members of the community, located where summers can be unpleasantly hot and winters unpleasantly cold, can be met with superinsulated designs. Here we will examine some possible options and our progress in bring them into existence. Planning tools, instructions, modifications, etc. will be included.

The Design Page is a good place to see what has been offered and to post any of your own great ideas. More ideas are great for everybody!

Survey & Design

The area on the property for the first group habitation was on a noticeable slope. OSE staff members worked with a home-made water level to take measurements over a 100' square area.

How to make a water level: http://www.youtube.com/watch?v=nAcT_1T25LM

Ideas submitted for this project are located on the Hab Lab Design Gallery page.

Building Orientation

Planning

Kitchen/Bath Water

Utility/Storage Area

Heating

Source Material

http://dnr.mo.gov/pubs/pub781.pdf

Site Preparation

Here is a picture with a preliminary excavation layout for the column pad sites and the retaining wall in the Hab Lab.

  • When you are laying out the excavation site, be sure to add 5' in each direction for the excavator to work to.


HabLab Excavation Layout.png

This levels diagram is from our theoretical measurements - we actually wound up with a 2' drop, not a 2'8" drop. That will make only a minor difference in raising the building - changing the size of the retaining wall and removing one or two CEB's at the top of the lower columns to maintain the planned roof pitch.

Levels Diagram for Hab Lab Site.png

Foundations & Column Slabs

  • With the site leveled, the foundation holes for the column slabs must be laid out.
  • After excavation, the stone fill for the foundation goes into the holes.
  • At the same time, the 6" stone floor foundation is spread.
  • Then we get to laying out the locations for the forms on top of the foundations.
    • After doing this in real life - More comments on that to come!
  • Here is the layout diagram to place the column forms.
HabLab Column Pad Form Layout.png

Concrete Work

===Insulated Outside Wall Support Slabs We are planning to put concrete the full 3' width of the Column Support Pads all the way around the outside of the building. They will be 3-1/2" (2x4 lumber size) deep and will support the two CEB walls that enclose the hay bale insulation.

Narrow Wall Support Slabs

We will support and stabilize the interior CEB walls with a 12" wide x 3-1/2" deep concrete slab.

Kitchen and Bath Areas

The Kitchen and Bath Floor Areas both have a potential for receiving noticeable amounts of water. We consider it advisable to pave them both with concrete and include a central drain.

Retaining Wall for Lower Level

CEB Columns

Insulated Roof

Super Insulated Walls

Heating the HabLab