XM: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
<html><img src="https://docs.google.com/drawings/pub?id=1LfaTjD41qFkCN7j_Opl8AvMWixz38rDrw447EwDJcdw&w= | <html><img src="https://docs.google.com/drawings/pub?id=1LfaTjD41qFkCN7j_Opl8AvMWixz38rDrw447EwDJcdw&w=480&h=360"></html> | ||
=Extreme Manufacturing Notes= | =Extreme Manufacturing Notes= |
Revision as of 04:40, 10 March 2012
Extreme Manufacturing Notes
- If design is separated from build, cost increases - with reference to Open Capitalist Platform. How to incorporate rapid delivery into Open Capitalist Platform.
- Assure integration via Contract-First Manufacturing (CFM)
- Example of excellent interface - [little bits - http://littlebits.cc/]
- Process: Breakdown -> CFM -> Test-Driven Manufacturing (TDM)
- TDM=Before any prototyping occurs, a test is defined to measure success of that prototyping
- MMF - Minimum Marketable Feature
- Definition of Ready - Ex. Replication of Wikispeed Car
- Definition of Done -
- Ex: 100mpg equivalent 2 passenger pelletized biomass-fueled Wikispeed car