XM Strategic Fabrication Analysis: Difference between revisions
Jump to navigation
Jump to search
(Created page with "This is a review of both the fabrication strategy and other elements: #Design for Tolerancing #Tool choice #Location of fabrication #Fabrication team modification - assign someo...") |
No edit summary |
||
Line 1: | Line 1: | ||
This is a review of both the fabrication strategy and other elements: | This is a review of both the fabrication strategy and other elements: | ||
#Design for Tolerancing | #[[Design for Tolerancing Review]] | ||
#Tool choice | #Tool choice - is the proposed tool choice effective, or could other tools speed up fabrication? | ||
#Location of fabrication | #Location of fabrication | ||
#Fabrication team modification - assign someone else to fabricate | #Fabrication team modification - assign someone else to fabricate |
Latest revision as of 02:58, 9 August 2013
This is a review of both the fabrication strategy and other elements:
- Design for Tolerancing Review
- Tool choice - is the proposed tool choice effective, or could other tools speed up fabrication?
- Location of fabrication
- Fabrication team modification - assign someone else to fabricate
- Fabricability checklist
- Review of materials sourcing
- Review of design after fabrication is considered