Project Manager: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
(Blanked the page)
Line 1: Line 1:
Project Manager (PM) Duties:


#Responsible for managing the overall progress of one of the 50 GVCS machines.
#Produces a development timeline, strategy, and budget for the project for review by the Projects Director.
#Follows up with team members on a regular basis to maintain progress, morale, and rapport throughout the development team.
#Follows up with CAD development and commits files to the design repository.
#Blogs on a weekly basis to provide development updates to the greater community.
#Engages in a weekly strategy/progress meeting with Projects Director.
#Recruits documenters to produce instructionals, master PDFs, Connexions documentation material, and other indispensable project outputs.
#Blogs updates and milestones on Factor e Farm Blog and feeds any required blog material to Factor e Farm Blogger
#Reports directly to Projects Director.
#Arranges for product testing and documents results. This person may collaborate directly with the Factor e Farm Director for the purpose of testing.
#Maintains an open, daily log of all relevant activity, including links to performance results obtained in field testing. This includes maintaining logs of expenditures on financial transparency wiki pages.
*This is a management role, where the Manager works with the successful bidding prototyper/designer (or volunteer) to manage the workflow of development.
*PM shall blog or co-blog on the [[Factor e Farm Blog]] regarding updates
*PM shall moderate or co-moderate the corresponding [[Technical Development Forum]] for the project
*PM shall work with a [[Documentor]] for the project to produce instructional videos, as delineated in the [[Instructional_Page_Template]]
[[Category: Standards]]

Revision as of 01:35, 12 April 2012