Define Development Pathway: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
|||
Line 18: | Line 18: | ||
[https://docs.google.com/drawings/d/17uJPicS6U384ZeOFUtmKKd9ZYrYm-aHaKTIhDwnlwX4/edit (edit)] | [https://docs.google.com/drawings/d/17uJPicS6U384ZeOFUtmKKd9ZYrYm-aHaKTIhDwnlwX4/edit (edit)] | ||
We plan to deploy the trencher Prototype I, Soil Pulverizer Prototype III, CEB press Prototype IV + V, Power Cube Prototype VI, Tractor Prototype V, Bulldozer Prototype I by December 1, 2012. | |||
==Mechanical== | ==Mechanical== | ||
==Power Electronics== | ==Power Electronics== |
Revision as of 02:14, 21 August 2012
Basic Burndown of Funding
The Development Pathway may be summarized as follows:
- Physical Infrastructure Stabilization - Milestones - Cost
- Organizational Infrastructure Stabilization - Milestones - Cost
- Recruit Team
- Develop Information Architecture Team
Technology Pathway
Overall pathway is this:
We plan to deploy the trencher Prototype I, Soil Pulverizer Prototype III, CEB press Prototype IV + V, Power Cube Prototype VI, Tractor Prototype V, Bulldozer Prototype I by December 1, 2012.
Mechanical
Power Electronics
Precision Machining
Metallurgy
Organizational Development
=