Pyrolysis Oil Project Status: Difference between revisions
Jump to navigation
Jump to search
Negligiblek (talk | contribs) No edit summary |
Negligiblek (talk | contribs) |
||
Line 1: | Line 1: | ||
=Current Development Stage(s)= | =Current Development Stage(s)= | ||
For the Deployment Stages see: | |||
[[Pyrolysis_Open_Source_Design_Rationale_(OSDR)#Deployment_Strategy]] | |||
==Model for Empirical Knowledge== | ==Model for Empirical Knowledge== | ||
*March 21st,2009 Purchased five feet of 3/4" copper pipe, five copper 3/4" 90 degree elbows, one 3/4" to 1/2" copper coupler, 10' feet of 1/2" nominal tubing, flux, silver solder, MAPP gas. | *March 21st,2009 Purchased five feet of 3/4" copper pipe, five copper 3/4" 90 degree elbows, one 3/4" to 1/2" copper coupler, 10' feet of 1/2" nominal tubing, flux, silver solder, MAPP gas. |
Revision as of 17:09, 22 March 2009
Current Development Stage(s)
For the Deployment Stages see: Pyrolysis_Open_Source_Design_Rationale_(OSDR)#Deployment_Strategy
Model for Empirical Knowledge
- March 21st,2009 Purchased five feet of 3/4" copper pipe, five copper 3/4" 90 degree elbows, one 3/4" to 1/2" copper coupler, 10' feet of 1/2" nominal tubing, flux, silver solder, MAPP gas.
- March 21st,2009 Cut to length all five feet of copper pipe