Income and Expense Reporting: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
See [[Delay Times in Online Financial Reporting]] | See [[Delay Times in Online Financial Reporting]] | ||
Line 4: | Line 6: | ||
*Income shall be updated on an ongoing basis upon money entering any account with up to a 24 hour delay for updates during working days | *Income shall be updated on an ongoing basis upon money entering any account with up to a 24 hour delay for updates during working days | ||
*Reporting shall be posted on the front page of the wiki - linked to [[OSE_Financial_Transparency_2012]] | *Reporting shall be posted on the front page of the wiki - linked to [[OSE_Financial_Transparency_2012]] | ||
*Each item shall be categorized by Grant or Source and by area (agriculture, construction, machine dev, overhead, etc) | |||
**Use columns for those labels so that whole list is organized automatically by Sort Sheet in Google Doc, see [https://docs.google.com/spreadsheet/ccc?key=0Aj7WbjRT9mlmdGRQU3lCZXpLRG11ZDJ1VmQwUGhqNGc#gid=1 example] |
Revision as of 14:00, 29 September 2012
See Delay Times in Online Financial Reporting
- Expenses shall be updated on an ongoing basis with up to a 24 hour delay for updates during working days
- Income shall be updated on an ongoing basis upon money entering any account with up to a 24 hour delay for updates during working days
- Reporting shall be posted on the front page of the wiki - linked to OSE_Financial_Transparency_2012
- Each item shall be categorized by Grant or Source and by area (agriculture, construction, machine dev, overhead, etc)
- Use columns for those labels so that whole list is organized automatically by Sort Sheet in Google Doc, see example