Aaron Log: Difference between revisions
Jump to navigation
Jump to search
Line 5: | Line 5: | ||
*Planning review strategy is listed [[Hybrid_Structuring_Strategy#Planning_Process|here]]. | *Planning review strategy is listed [[Hybrid_Structuring_Strategy#Planning_Process|here]]. | ||
'''Remote Machine Designer Project Management''' - Lenny-Wayne Patterson | |||
*Met with him and Marcin | |||
*[https://docs.google.com/drawings/d/16y7VVgtAbCpDDkqgLv_7WhjibEYdp3net10WgCXZlgw/edit Design review document] - made changes for ease of fabrication | |||
*Worked with Aidan and Marcin to get a student license of VariCAD for Lenny-Wayne. | |||
*Started [https://docs.google.com/document/d/10MUkGLkU31CK8VDnFHiDff_sAbLNCE1uaiTIISsYcYY/edit blog post] draft with Lenny-Wayne on the design of the next backhoe. | |||
=10/01/12= | =10/01/12= |
Revision as of 03:25, 3 October 2012
Oct 2, 2012
Hybrid Structuring Strategy Diagram
- Made graphical representation of relevant elements.
- My next step is to write a two-page narrative summary of the plan and then solicit plan review.
- Planning review strategy is listed here.
Remote Machine Designer Project Management - Lenny-Wayne Patterson
- Met with him and Marcin
- Design review document - made changes for ease of fabrication
- Worked with Aidan and Marcin to get a student license of VariCAD for Lenny-Wayne.
- Started blog post draft with Lenny-Wayne on the design of the next backhoe.
10/01/12
Remote Management of Machine Designer - Lenny-Wayne Patterson
Remote Management of Machine Designer - Tim Boyd
Accounting
- Downloaded UWCU transaction history
- Downloaded Sesloc transaction history from 06/01/12 to present (all that is available for download)
- 2012 Transaction History
- OSE Financial Transparency 2012 - transfered transactions I could understand
- To Do: see if checks are scanned and viewable online, check with Marcin on items I don't recognize
CNC Torch Table
- Checked with Yoonseo on the status of the torch table:
I've got torch table electronics handled. It will be very similar to the system used for the CNC Circuit Mill V2. Just a matter of making a large case, large screw terminals, then mounting and wiring the new stepper drivers (from Darren) with the Arduino Uno R3. Darren has a friend updating the gcode interpreter code. The mechanical side of the torch table is relatively easy and near completion. Marcin was on this last we discussed. Best, Yoonseo
09/30/12
- Hybrid Structuring Strategy - Request for Hybrid Structuring Strategy from Marcin
- Strategic Plan: transfered wiki doc to google doc.
- Trencher: cut teeth off and took video for final video/blog post
- Dan McCormick: set up meeting for Tuesday, October 2
- Food Buying System: set up meeting with Shari for Tuesday, October 2. Write down agenda to make meeting effective and to shorten it from 1 hour to 15 minutes.
- Induction Furnace: set up meeting with Tim Boyd for Monday, October 1. Write down agenda for review.
- Backhoe: requested meeting for this week regarding finalization of design according to OSE Specs. span style="color:red"> Do you know what chnanges need to be made to make it more OSE Spec?
- Email System: installed ActiveInbox
- Accounting:
- 990 Decoder: automatically generates financial reports using IRS 990 format
- Financial Controls: began making granular list of steps for strategy & integrated into OSE - Accounting - Work Breakdown Structure
- OSE - Accounting - Work Breakdown Structure: began diagraming components of accounting system - boxes are linked to granular steps.
- Financial Controls Research