Modular Stove Fabrication Procedure: Difference between revisions
Jump to navigation
Jump to search
(→Step 2) |
(→Step 2) |
||
Line 16: | Line 16: | ||
<html></html> | <html></html> | ||
**Result: corners fit together such that all metal angle form flat planes | **Result: corners fit together such that all metal angle form flat planes | ||
[[Image:mitered.jpg|300|Mitered corners with 2"x2" angle | [[Image:mitered.jpg|300|Mitered corners with 2"x2" angle]] | ||
===Quality Control=== | ===Quality Control=== | ||
*3 corners fit so there is no more than 1/8" space anywhere | *3 corners fit so there is no more than 1/8" space anywhere |
Revision as of 23:14, 16 October 2012
BOM
Start with BOM.
Build
Step 1
Study Concept: 2 boxes with slideable cover plates clamped down. Ash tray and flame deflector plates side in similar fashion.
Step 2
- Cut angle for 2 mitered frames, just like for Power Cube 6.
- Use Ironworker for mitered cuts:
- Result: corners fit together such that all metal angle form flat planes
Quality Control
- 3 corners fit so there is no more than 1/8" space anywhere
- length of members within 1/4" tolerance
Then, the build:
Step 3