Modular Stove Fabrication Procedure: Difference between revisions
Jump to navigation
Jump to search
(→BOM) |
(→Step 3) |
||
Line 35: | Line 35: | ||
==Step 3== | ==Step 3== | ||
*Weld frame as this: | |||
<html> | <html><img src="https://docs.google.com/drawings/pub?id=1kdaehammY8qdTZvjXzBVCgR8YxFVGlhZzbcQoxZVK0Q&w=480&h=360"> | ||
</html> | </html> |
Revision as of 23:36, 16 October 2012
BOM
Start with BOM.
Mild Steel
- 1/4"x2"x2" angle - $2.41/ft
- 1/8"x1/2"x1/2" angle - $0.66/ft
- 1/8"x4'x8' sheet - $100
Build
Step 1
Study Concept: 2 boxes with slideable cover plates clamped down. Ash tray and flame deflector plates side in similar fashion.
Step 2
- Cut angle for 2 mitered frames, just like for Power Cube 6. 1/4"x2"x2" angle BOM:
- [12] - 4' long
- [18] - 2' long
- [6] - 1' long
- Use Ironworker for mitered cuts:
- Result: corners fit together such that all metal angle form flat planes
Quality Control
- 3 corners fit so there is no more than 1/8" space anywhere
- length of members within 1/4" tolerance
Then, the build:
Step 3
- Weld frame as this: