Yoonseo Log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
=Future=
=Future=


Order steppernugs with onboard voltage regulator and header-configurable (or neutral-on) ENA and Reset pins so that the only pins needed to use are CLK, DIR, GND, VMOT instead of CLK, DIR, Reset, ENA, Vcc, GND, VMOT


Prepare [[CEB Press]] Electronics


Look into [[Speedy Metals]] [[Tool Steel]] selection
[[Backlog]]
 
Get iron from [[Speedymetals]] for [[Boxed Way]]
 
Design Conduit
 
[[Computer Platform]]
 
Organize drill bits
 
Design [[Long Organizer]] (to hold lengths of stock metal/plastics/rubbers/other)
 
Design [[Adjustable Platform]]
 
[[Boxed Way]] [[Leadscrew]]s and [[Leadscrew Nut]]s
 
[[Boxed Way]] [[Shaft Coupling]]s
 
Mobile Tables
 
Fabricate aluminum [[Funnel]]
 
Order impact drivers and drills
 
CNC Mill V2
 
CNC Lathe
 
<<Health and Safety
 
First Aid and Emergency Response
 
Precision Machines
 
Electronics
 
Autonomous Machine Code
 
Computer Aided Manufacturing>>
 
Universal Power Supply (Inverter/Welder/Plasma Cutter/...)
 
Electric Motor
 
Induction Furnace
 
Encoder Test
 
Mini Clamp
 
Battery Holder
 
Visual Display Module
 
Software Dev
 
----
 
Computer/Server (info processing) Tech
 
Bioscience Devtech  Build/Get and Deploy
 
Chemical/Materials Science Devtech Build/Get and Deploy
 
Metal casting/forging Devtech Build/Get and Deploy
 
Semiconductor Tech
 
Laser Tech
 
Satellite/Telecom Tech
 
Energized Particle Tech


=December 2012=
=December 2012=

Revision as of 08:05, 19 December 2012

Future

Backlog

December 2012

18

Well, editing the wiki is so darn accessible. I'm going to try wiki-logging again.

CEB Press 1-Day Production Run

Past

Yoonseo Log 2012

<2/2012