FeF Prototyping Schedule 2013: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
*Product Lead, Documenter, Ops Manager,  recruited by April 1
*Product Lead, Documenter, Ops Manager,  recruited by April 1
*Apr 19-20 - CNC Torch table
*Apr 19-20 - CNC Torch table
*(April 26-28 - OSHW Hackberry Jam)
*(April 26-28 - [[OSHW]] Hackberry Jam)
*(May 2-4 - Seoul Digital Forum)
*(May 2-4 - Seoul Digital Forum)
*May 10-11  - Bulldozer + geardown + blade + weights modules
*May 10-11  - Bulldozer + geardown + blade + weights modules

Revision as of 14:49, 12 March 2013

  • Product Lead, Documenter, Ops Manager, recruited by April 1
  • Apr 19-20 - CNC Torch table
  • (April 26-28 - OSHW Hackberry Jam)
  • (May 2-4 - Seoul Digital Forum)
  • May 10-11 - Bulldozer + geardown + blade + weights modules
  • May 17-18 - CNC Circuit Mill + 3D Printer
  • May 24-25 - Large Power Cube module - 150 hp
  • May 31-1 - OS Car
  • Jun 7-8 - Ironworker redesign for fabrication
  • Jun 14-15 - Open Source Laser Cutter
  • Jun 21-22 - Open Source MIG Welder power supply, OS wire feed, OS Gas feed, to standard gun.

With CNC Torch Table, Ironworker, and Welder power supply, we can fabricate rapidly.