Inga's House: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 9: | Line 9: | ||
#Combine user's design specification with available resources and systems requirements of Factor e Farm | #Combine user's design specification with available resources and systems requirements of Factor e Farm | ||
#Collect a team of architects - Franz Nahrada leads this process | #Collect a team of architects - Franz Nahrada leads this process | ||
# | #Evaluations of Team Members' contributions with regard to open source process | ||
*Modular architecture development | |||
**Modularize components of the house - electric, waste, interior design, structural engineering, HVAC | |||
=Design Rationale= | =Design Rationale= |
Revision as of 10:04, 22 May 2009
Introduction
First case study of a virtual architecture project.
Process:
- Design specifications from the user (Inga)
- Document the site, with on-demand, virtual walkthrough from Factor e Farm
- Combine user's design specification with available resources and systems requirements of Factor e Farm
- Collect a team of architects - Franz Nahrada leads this process
- Evaluations of Team Members' contributions with regard to open source process
- Modular architecture development
- Modularize components of the house - electric, waste, interior design, structural engineering, HVAC
Design Rationale
Project Team
- Franz Nahrada
- Dustin, architect
- Michaela
- Marcin
- Inga
- Sam Rose
- Steve Bosserman
- Vinay Gupta
- Peter Thomas
- Joseph Smyth
- Tony S. Gwilliam (Tony's T-Houses)