Lucas's Log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 3: Line 3:
==June 3==
==June 3==


==4 June==
==June 4==
===Work on the MicroTrac:===
===Work on the MicroTrac:===
I'm currently working on this (8:00pm June 4) I will soon have a written description of the day's proceedings and thought processes. For now, here is my work on the MicroTrac:
I'm currently working on this (8:00pm June 4) I will soon have a written description of the day's proceedings and thought processes. For now, here is my work on the MicroTrac:


[[File:MicroTrac seat and controls (prototype).skp]]
[[File:MicroTrac seat and controls (prototype).skp]]


==June 5==
==June 5==

Revision as of 00:06, 6 June 2013

Lucas's Log, Summer Internship 2013

June 3

June 4

Work on the MicroTrac:

I'm currently working on this (8:00pm June 4) I will soon have a written description of the day's proceedings and thought processes. For now, here is my work on the MicroTrac:

File:MicroTrac seat and controls (prototype).skp

June 5

Proof-Reading the IronWorker Drawing

Here is the IronWorker SketchUp file. Design concerns detailed in the images below are not reflected in the updated SketchUp file. This file does have the updated/corrected BOM.


File:BOM.odt


File:IronworkerBOM.skp


Hole spacing issue.PNG


Hole spacing issue 2.PNG


Missing hole and clarification.PNG


Shearing bolt heads problem.PNG


Unnecessary piece maybe.PNG


Cross-section of shear and bracket with suggestion.PNG