Power Cube - Build Videos: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 13: Line 13:
<html><iframe width="420" height="315" src="//www.youtube.com/embed/IMfLy0E-h-s" frameborder="0" allowfullscreen></iframe></html>
<html><iframe width="420" height="315" src="//www.youtube.com/embed/IMfLy0E-h-s" frameborder="0" allowfullscreen></iframe></html>


(45 minutes)
(45 minutes. Most of the 2 hours was spent on shifting tubes and figuring out bolt pattern in real life. Expected build time (inserting and mounting 24 bolts, plus 8 bolts for stabilizing plates for Power Cube) once procedure is set is under 1 hour.)


Then you bring the tractor in:
Then you bring the tractor in:

Revision as of 13:44, 25 September 2013

Using cutting stops, it takes 40 minutes to cut with torch and grind edges of 12 Power Cube frame members, 32", 40", 48" long - out of 10' stock sections.

(15 sec = 40 minutes on time lapse every 5 seconds)

Then you build the frame around a 27 hp Power Cube:

(1 hour 15 minutes)

(45 minutes. Most of the 2 hours was spent on shifting tubes and figuring out bolt pattern in real life. Expected build time (inserting and mounting 24 bolts, plus 8 bolts for stabilizing plates for Power Cube) once procedure is set is under 1 hour.)

Then you bring the tractor in:

(1 hour 6 minutes - included remounting loose power cube (1) on LT 6, replacing 2 bolts on the LT 6 power cube compartment, and replacing 4 bolts on the Power Cube (2) - to remove bolt conflicts)

And mount the Power Cube on the tractor: