Trencher Chute Build Instructions: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "#Cut 2 2x4 pieces of lumber to 6 feet in length #Drill out 2 holes in each (for threaded rod below) #Cut one 16 hole piece and 2 pieces of 4 hole 4" stock square tubing #Mount...")
 
No edit summary
 
Line 1: Line 1:
See development index at http://opensourceecology.dozuki.com/c/Trencher
#Cut 2 2x4 pieces of lumber to 6 feet in length
#Cut 2 2x4 pieces of lumber to 6 feet in length
#Drill out 2 holes in each (for threaded rod below)
#Drill out 2 holes in each (for threaded rod below)

Latest revision as of 23:42, 10 December 2013

See development index at http://opensourceecology.dozuki.com/c/Trencher

  1. Cut 2 2x4 pieces of lumber to 6 feet in length
  2. Drill out 2 holes in each (for threaded rod below)
  3. Cut one 16 hole piece and 2 pieces of 4 hole 4" stock square tubing
  4. Mount to trencher frame
  5. Build up F-shape as in https://opensourceecology.trovebox.com/p/2pf/album-n?sortBy=dateTaken,asc and cut 2 pieces of 30" long 1" threaded rod for hanging the spool
  6. Put 1" water tubing over the threaded rod to prevent the threaded rod from cutting the water tubing
  7. Mount the first piece of 2x4 lumber on the threaded rod, mount the reel of tubing, and mount the second 2x4 piece of lumber.