Trencher Chute Build Instructions: Difference between revisions
Jump to navigation
Jump to search
(Created page with "#Cut 2 2x4 pieces of lumber to 6 feet in length #Drill out 2 holes in each (for threaded rod below) #Cut one 16 hole piece and 2 pieces of 4 hole 4" stock square tubing #Mount...") |
No edit summary |
||
Line 1: | Line 1: | ||
See development index at http://opensourceecology.dozuki.com/c/Trencher | |||
#Cut 2 2x4 pieces of lumber to 6 feet in length | #Cut 2 2x4 pieces of lumber to 6 feet in length | ||
#Drill out 2 holes in each (for threaded rod below) | #Drill out 2 holes in each (for threaded rod below) |
Latest revision as of 23:42, 10 December 2013
See development index at http://opensourceecology.dozuki.com/c/Trencher
- Cut 2 2x4 pieces of lumber to 6 feet in length
- Drill out 2 holes in each (for threaded rod below)
- Cut one 16 hole piece and 2 pieces of 4 hole 4" stock square tubing
- Mount to trencher frame
- Build up F-shape as in https://opensourceecology.trovebox.com/p/2pf/album-n?sortBy=dateTaken,asc and cut 2 pieces of 30" long 1" threaded rod for hanging the spool
- Put 1" water tubing over the threaded rod to prevent the threaded rod from cutting the water tubing
- Mount the first piece of 2x4 lumber on the threaded rod, mount the reel of tubing, and mount the second 2x4 piece of lumber.