Solar Village 2010: Difference between revisions
Jump to navigation
Jump to search
(→Steps) |
|||
Line 32: | Line 32: | ||
##Air-powered water pump | ##Air-powered water pump | ||
Summary: June-July will be shakedown of | Summary: May will be heavy equipment building time, and June-July will be shakedown of all the building equipment, techniques, water system and site prep, and production of materials (lumber, brick, mortar). August 1 - house is going up. | ||
'''Uniqueness summary: LifeTrac II, Sawmill, Air powered water pump, CEB stove, CEB floor, OS blade, PowerCube II, CEB-Straw Bale hybrid | '''Uniqueness summary: LifeTrac II, Sawmill, Air powered water pump, CEB stove, CEB floor, OS blade, PowerCube II, CEB-Straw Bale hybrid | ||
''' | ''' | ||
=Timeline= | =Timeline= | ||
Revision as of 22:37, 28 March 2010
Steps For Building a Solar Structure
Review of concept to date:
- CEB walls
- Straw bale infill between 2 wall cavities
- House-integrated CEB stove
- Thermaclear or Solexx glazing
- Structure similar to
but solar cover extends from green roof
- Greenspace
- Green roof
- Trellis for solar shade in summer
- Trellis is covered partly with roofing material with solar angle to allow for solar gain only in winter
- Rest of trellis will be growing grapes
- Composting toilet
- CEB floor
- Side space covered for rooftop rainwater catchment and CEB water cistern
- Planter in front and sides - zone 0 plantings in planter
- Keyhole garden
Steps
- Site prep - flatten site with front loader and blade
- Build blade
- Build LifeTrac II
- Build sawmill
- Building material prep
- Rollers
- Sawmilling in July
- Truss preparation
- Test stabilized bricks
- Test reject lime-cement bricks?#Initial experiments with
- Air-powered water pump
Summary: May will be heavy equipment building time, and June-July will be shakedown of all the building equipment, techniques, water system and site prep, and production of materials (lumber, brick, mortar). August 1 - house is going up.
Uniqueness summary: LifeTrac II, Sawmill, Air powered water pump, CEB stove, CEB floor, OS blade, PowerCube II, CEB-Straw Bale hybrid
Timeline
- April 15-30 - Dimensional Sawmill Prototype design
- Assuming 1 CEB presss production
- May 1-31 - Build LifeTrac II, PowerCube II, build Sawmill, build leveling blade, build LifeTrac wheel tracks if budget allows
- June - July - Cut lumber, test stabilized and lime bricks, do the well pump and prepare water lines, site preparation, build trusses, prepare brick rollers
- Test whether water-sraying between courses works (so called 'dry stacking'), or, prepare slurry mixing equipment (either 55 gal drum or 200 gal container)