==Tues. 3 Jun 2014== | ==Tues. 3 Jun 2014== | ||
Documented problems encountered during [http://opensourceecology.org/wiki/Lasersaur_Exterior_Panel_Installation Lasersaur Exterior Panel Installation] | *Documented problems encountered during [http://opensourceecology.org/wiki/Lasersaur_Exterior_Panel_Installation Lasersaur Exterior Panel Installation] | ||
*Started Workshop reorganize and fixed some power tool plugs and extension cord ends. | |||
*Worked with a team to reassemble the CEB Press. Learned it is important to have a CAD model that matches the actual model. Also good to replace nuts and washers onto corresponding bolts while disassembling in order to simplify reassembly. | |||
==Mon. 2 Jun 2014== | ==Mon. 2 Jun 2014== |
Revision as of 14:58, 4 June 2014
Tues. 3 Jun 2014
- Documented problems encountered during Lasersaur Exterior Panel Installation
- Started Workshop reorganize and fixed some power tool plugs and extension cord ends.
- Worked with a team to reassemble the CEB Press. Learned it is important to have a CAD model that matches the actual model. Also good to replace nuts and washers onto corresponding bolts while disassembling in order to simplify reassembly.
Mon. 2 Jun 2014
- Sketchup practice
- CEB Press 6 - Drawer Guides - Build Instructions
- Started Mounting Lasersaur CNC Laser Cover Plates: need to drill additional holes as per Lasersaur Manual
- Edited Lasersaur CAD model to include dimensions and location of panel holes [1],[2],[3],[4],[5],[6]
Sat. 31 May 2014
- Finalized prep for OSE
- Installed software recommended in DPV Offer Letter