Cris Log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 2: Line 2:
*Uploaded [[File:CEBPressSolenoidAssembly.skp]]
*Uploaded [[File:CEBPressSolenoidAssembly.skp]]
*Uploaded uncorrupted [[File:CEB Press 6 Fabrication Drawings.zip]]
*Uploaded uncorrupted [[File:CEB Press 6 Fabrication Drawings.zip]]
*Got dimensions of Solenoid Assembly Hydraulic connections for updating of CAD models [https://opensourceecology.trovebox.com/photos/album-15/token-40e2e0b983/list see photos of actual assembly]
*Created schematic of Solenoid Assembly with Hydraulic Connectors in [https://docs.google.com/presentation/d/1SUUtXan2g-ZltK5WlgeAXnqHiHaWgqLzG8JlQRqrjkc/edit#slide=id.g1d984a886_017 google presentation]
*Created [[http://opensourceecology.org/wiki/Lasersaur_Exterior_Panel_Installation]] to document current status of Lasersaur exterior panel installation


==Wed. 4 Jun. 2014==
==Wed. 4 Jun. 2014==

Revision as of 19:49, 5 June 2014

Thur. 5 Jun. 2014

Wed. 4 Jun. 2014

Tues. 3 Jun 2014

  • Documented problems encountered during Lasersaur Exterior Panel Installation
  • Started Workshop reorganize and fixed some power tool plugs and extension cord ends.
  • Worked with a team to reassemble the CEB Press. Learned it is important to have a CAD model that matches the actual model. Also good to replace nuts and washers onto corresponding bolts while disassembling in order to simplify reassembly.

Mon. 2 Jun 2014

Sat. 31 May 2014

  • Finalized prep for OSE
  • Installed software recommended in DPV Offer Letter