Greg Log: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| No edit summary | No edit summary | ||
| Line 1: | Line 1: | ||
| =2014 June 10 Tuesday= | |||
| *Presented 3D printing results at morning meeting | |||
| *Began work on CEB Press .SKP | |||
| =2014 June 9 Monday= | =2014 June 9 Monday= | ||
| Line 6: | Line 8: | ||
| *Oriented self to basic CEB Press operation, brick compression process | *Oriented self to basic CEB Press operation, brick compression process | ||
| *Swarmed on getting 3D printers up and running - worked on HYDRA Lulzbot. Got it connected to computer, leveled printbed pretty well. Ran into troubles with .gcode files - printer randomly stops prematurely, causing print to fail. Looks like Colten had similar troubles: [[Colten Jackson Log]] | *Swarmed on getting 3D printers up and running - worked on HYDRA Lulzbot. Got it connected to computer, leveled printbed pretty well. Ran into troubles with .gcode files - printer randomly stops prematurely, causing print to fail. Looks like Colten had similar troubles: [[Colten Jackson Log]] | ||
| *Successfully printed an Octopus on the TAZ out of pink PLA plastic: | |||
| [[File:3D print PLA Octopus.jpg|540px]] | |||
| =2014 June 8 Sunday= | =2014 June 8 Sunday= | ||
| Arrived at Factor-e Farm. Got settled in, setup living situation, met team. | Arrived at Factor-e Farm. Got settled in, setup living situation, met team. | ||
Revision as of 14:49, 10 June 2014
2014 June 10 Tuesday
- Presented 3D printing results at morning meeting
- Began work on CEB Press .SKP
2014 June 9 Monday
- First day of work. Attended orientation, began worklog, hit the ground running.
- Worked on CEB Press Drawer Module documentation
- Oriented self to basic CEB Press operation, brick compression process
- Swarmed on getting 3D printers up and running - worked on HYDRA Lulzbot. Got it connected to computer, leveled printbed pretty well. Ran into troubles with .gcode files - printer randomly stops prematurely, causing print to fail. Looks like Colten had similar troubles: Colten Jackson Log
- Successfully printed an Octopus on the TAZ out of pink PLA plastic:
2014 June 8 Sunday
Arrived at Factor-e Farm. Got settled in, setup living situation, met team.
