=Mon Jul 21, 2014= | =Mon Jul 21, 2014= | ||
'''morning: | '''morning: | ||
removed hopper, grate, and shaker from CEB in order to manually produce bricks. | |||
conducted several soil tests on piles 1,2,3 of soil. | conducted several soil tests on piles 1,2,3 of soil. | ||
pressed several bricks manually, and recorded data on brick uniformity | pressed several bricks manually, and recorded data on brick uniformity | ||
'''afternoon''' | '''afternoon''' | ||
assisted with installing metal siding of pool | assisted with installing metal siding of pool |
Revision as of 19:25, 22 July 2014
Wed Jul 16, 2014
Arrive at the farm!
Thurs Jul 17, 2014
Build shelves in the old workshop to organize into an outdoor kitchen space. Assist with hydraulic tubing for brick press
Fri Jul 18, 2014
hydraulic tubing for brick press. assisted with installation of the shaker, and the grate. Pressed 2 bricks! -the soil was too wet.
worked on publicity for microhouse workshop, reaching out to several colleges and universities in Missouri
Mon Jul 21, 2014
morning:
removed hopper, grate, and shaker from CEB in order to manually produce bricks. conducted several soil tests on piles 1,2,3 of soil. pressed several bricks manually, and recorded data on brick uniformity
afternoon
assisted with installing metal siding of pool