Ellena log: Difference between revisions
No edit summary |
|||
Line 1: | Line 1: | ||
= | =Fru Jul 25, 2014= | ||
filled in septic tank hole for microhouse 3 | |||
=Thurs Jul | =Thurs Jul 24, 2014= | ||
built a second picnic table! | |||
pressed bricks with varying quantities of dirt,sand, and cement to test different proportions for stabilization | |||
= | =Wed Jul 23, 2014= | ||
'''morning: | '''morning:''' | ||
cleaned out old workshop space for outdoor kitchen | |||
'''afternoon''' | '''afternoon''' | ||
pressed bricks with different measured quantities of dirt, sand, and cement | |||
recorded data | |||
=Tues Jul 22, 2014= | =Tues Jul 22, 2014= | ||
finished pool | finished pool! swimming! | ||
CEB press | CEB press | ||
=Mon Jul 21, 2014= | |||
'''morning: | |||
removed hopper, grate, and shaker from CEB press in order to manually produce bricks. | |||
conducted several soil tests on piles 1,2,3 of soil. | |||
pressed several bricks manually, and recorded data on brick uniformity | |||
'''afternoon''' | '''afternoon''' | ||
= | assisted with installing metal siding of pool | ||
=Fri Jul 18, 2014= | |||
hydraulic tubing for brick press. assisted with installation of the shaker, and the grate. | |||
Pressed 2 bricks! -the soil was too wet. | |||
worked on publicity for microhouse workshop, reaching out to several colleges and universities in Missouri | |||
=Thurs Jul 17, 2014= | |||
Build shelves in the old workshop to organize into an outdoor kitchen space. | |||
Assist with hydraulic tubing, installing quick couplers on tubes for CEB press | |||
=Wed Jul 16, 2014= | |||
Arrive at the farm! |
Revision as of 19:16, 25 July 2014
Fru Jul 25, 2014
filled in septic tank hole for microhouse 3
Thurs Jul 24, 2014
built a second picnic table!
pressed bricks with varying quantities of dirt,sand, and cement to test different proportions for stabilization
Wed Jul 23, 2014
morning:
cleaned out old workshop space for outdoor kitchen
afternoon pressed bricks with different measured quantities of dirt, sand, and cement recorded data
Tues Jul 22, 2014
finished pool! swimming!
CEB press
Mon Jul 21, 2014
morning:
removed hopper, grate, and shaker from CEB press in order to manually produce bricks. conducted several soil tests on piles 1,2,3 of soil. pressed several bricks manually, and recorded data on brick uniformity
afternoon
assisted with installing metal siding of pool
Fri Jul 18, 2014
hydraulic tubing for brick press. assisted with installation of the shaker, and the grate. Pressed 2 bricks! -the soil was too wet.
worked on publicity for microhouse workshop, reaching out to several colleges and universities in Missouri
Thurs Jul 17, 2014
Build shelves in the old workshop to organize into an outdoor kitchen space. Assist with hydraulic tubing, installing quick couplers on tubes for CEB press
Wed Jul 16, 2014
Arrive at the farm!