=Wed Jul 16, 2014=
=Fru Jul 25, 2014=
Arrive at the farm!
 
filled in septic tank hole for microhouse 3


=Thurs Jul 17, 2014=
=Thurs Jul 24, 2014=
Build shelves in the old workshop to organize into an outdoor kitchen space.
Assist with hydraulic tubing, installing quick couplers on tubes for CEB


=Fri Jul 18, 2014=
built a second picnic table!
hydraulic tubing for brick press. assisted with installation of the shaker, and the grate.
Pressed 2 bricks! -the soil was too wet.


worked on publicity for microhouse workshop, reaching out to several colleges and universities in Missouri
pressed bricks with varying quantities of dirt,sand, and cement to test different proportions for stabilization


=Mon Jul 21, 2014=  
=Wed Jul 23, 2014=
'''morning:
'''morning:'''


removed hopper, grate, and shaker from CEB press in order to manually produce bricks.
cleaned out old workshop space for outdoor kitchen
conducted several soil tests on piles 1,2,3 of soil.
pressed several bricks manually, and recorded data on brick uniformity


'''afternoon'''
'''afternoon'''
 
pressed bricks with different measured quantities of dirt, sand, and cement
assisted with installing metal siding of pool
recorded data


=Tues Jul 22, 2014=  
=Tues Jul 22, 2014=  


finished pool-
finished pool! swimming!
   
   
CEB press
CEB press


=Wed Jul 23, 2014=
'''morning:'''


cleaned out old workshop space for outdoor kitchen
=Mon Jul 21, 2014=
'''morning:
 
removed hopper, grate, and shaker from CEB press in order to manually produce bricks.
conducted several soil tests on piles 1,2,3 of soil.
pressed several bricks manually, and recorded data on brick uniformity


'''afternoon'''
'''afternoon'''
pressed bricks with different measured quantities of dirt, sand, and cement
recorded data


=Thurs Jul 24, 2014=
assisted with installing metal siding of pool
 
=Fri Jul 18, 2014=
hydraulic tubing for brick press. assisted with installation of the shaker, and the grate.
Pressed 2 bricks! -the soil was too wet.
 
worked on publicity for microhouse workshop, reaching out to several colleges and universities in Missouri


built a second picnic table!
=Thurs Jul 17, 2014=
Build shelves in the old workshop to organize into an outdoor kitchen space.
Assist with hydraulic tubing, installing quick couplers on tubes for CEB press


pressed bricks with varying quantities of dirt,sand, and cement to test different proportions for stabilization
=Wed Jul 16, 2014=
Arrive at the farm!

Revision as of 19:16, 25 July 2014

Fru Jul 25, 2014

filled in septic tank hole for microhouse 3

Thurs Jul 24, 2014

built a second picnic table!

pressed bricks with varying quantities of dirt,sand, and cement to test different proportions for stabilization

Wed Jul 23, 2014

morning:

cleaned out old workshop space for outdoor kitchen

afternoon pressed bricks with different measured quantities of dirt, sand, and cement recorded data

Tues Jul 22, 2014

finished pool! swimming!

CEB press


Mon Jul 21, 2014

morning:

removed hopper, grate, and shaker from CEB press in order to manually produce bricks. conducted several soil tests on piles 1,2,3 of soil. pressed several bricks manually, and recorded data on brick uniformity

afternoon

assisted with installing metal siding of pool

Fri Jul 18, 2014

hydraulic tubing for brick press. assisted with installation of the shaker, and the grate. Pressed 2 bricks! -the soil was too wet.

worked on publicity for microhouse workshop, reaching out to several colleges and universities in Missouri

Thurs Jul 17, 2014

Build shelves in the old workshop to organize into an outdoor kitchen space. Assist with hydraulic tubing, installing quick couplers on tubes for CEB press

Wed Jul 16, 2014

Arrive at the farm!