MicroHouse 3 - Module - Review: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
=Response Form= | |||
<html> | <html> | ||
<iframe src="https://docs.google.com/forms/d/1fiiNl91oq8kMQct3WGFpoJOvVhia5FRPqRp4wSbRx4g/viewform?embedded=true" width="760" height="500" frameborder="0" marginheight="0" marginwidth="0"> | <iframe src="https://docs.google.com/forms/d/1fiiNl91oq8kMQct3WGFpoJOvVhia5FRPqRp4wSbRx4g/viewform?embedded=true" width="760" height="500" frameborder="0" marginheight="0" marginwidth="0"></iframe><br/></html> | ||
=Review Request Document= | |||
<html><iframe src="https://docs.google.com/document/d/18H7raBuDJRGA0B-7MiYmyDmBFUZyWwY_UBogVh1YhKo/pub?embedded=true" width=100% height=500></iframe></html><br/>[https://docs.google.com/document/d/18H7raBuDJRGA0B-7MiYmyDmBFUZyWwY_UBogVh1YhKo/edit edit this document] | |||
=Review Question Media= | |||
==Question 1== | |||
Should the first floor bond beam go around the entire perimeter of the house? | |||
[[File:BondBeam.jpg|500px]] | |||
==Question 2== | |||
Is the mounting of rafters to the upper and lower mid truss strong enough? | |||
[[File:MidTruss1.jpg|500px]] | |||
[[File:MidTruss2.jpg|500px]] | |||
Should cripple studs be added to connect the upper and lower 2x12’s and the rafters? | |||
[[File:CrippleStuds.jpg|500px]] | |||
==Question 3== | |||
In what order should the flashing, tar paper, and corrugated roofing be installed? | |||
[[File:Roof.jpg|500px]] |
Revision as of 15:21, 19 August 2014
Response Form
Review Request Document
Review Question Media
Question 1
Should the first floor bond beam go around the entire perimeter of the house?
Error creating thumbnail: File missing
Question 2
Is the mounting of rafters to the upper and lower mid truss strong enough?
Error creating thumbnail: File missing
Error creating thumbnail: File missing
Should cripple studs be added to connect the upper and lower 2x12’s and the rafters?
Error creating thumbnail: File missing
Question 3
In what order should the flashing, tar paper, and corrugated roofing be installed?
Error creating thumbnail: File missing