MicroHouse 3 - Module - Review: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 9: | Line 9: | ||
==Question 1== | ==Question 1== | ||
Should the first floor bond beam go around the entire perimeter of the house? | Should the first floor bond beam go around the entire perimeter of the house? | ||
[[File:BondBeam.jpg|500px]] | [[File:BondBeam.jpg|500px]] | ||
Revision as of 15:43, 19 August 2014
Response Form
Review Request Document
Review Question Media
Question 1
Should the first floor bond beam go around the entire perimeter of the house?
Error creating thumbnail: File missing
Question 2
Is the mounting of rafters to the upper and lower mid truss strong enough?
Error creating thumbnail: File missing
Error creating thumbnail: File missing
Should cripple studs be added to connect the upper and lower 2x12’s and the rafters?
Error creating thumbnail: File missing
Question 3
In what order should the flashing, tar paper, and corrugated roofing be installed?
Error creating thumbnail: File missing