MicroHouse 3 - Module - Review: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 1: | Line 1: | ||
=Response Form= | =MicroHouse Review Response Form= | ||
<html> | <html> | ||
<iframe src="https://docs.google.com/forms/d/1fiiNl91oq8kMQct3WGFpoJOvVhia5FRPqRp4wSbRx4g/viewform?embedded=true" width="760" height="500" frameborder="0" marginheight="0" marginwidth="0"></iframe><br/></html> | <iframe src="https://docs.google.com/forms/d/1fiiNl91oq8kMQct3WGFpoJOvVhia5FRPqRp4wSbRx4g/viewform?embedded=true" width="760" height="500" frameborder="0" marginheight="0" marginwidth="0"></iframe><br/></html> |
Revision as of 15:53, 19 August 2014
MicroHouse Review Response Form
Review Request Document
Review Question Media
Question 1
Should the first floor bond beam go around the entire perimeter of the house?
Error creating thumbnail: File missing
Question 2
Is the mounting of rafters to the upper and lower mid truss strong enough?
Error creating thumbnail: File missing
Error creating thumbnail: File missing
Should cripple studs be added to connect the upper and lower 2x12’s and the rafters?
Error creating thumbnail: File missing
Question 3
In what order should the flashing, tar paper, and corrugated roofing be installed?
Error creating thumbnail: File missing