Jose Antonio log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 214: Line 214:
2014-08-23 Monday:
2014-08-23 Monday:
---------------------
---------------------
* Assemblying the CEB Press testing machine.
* Assemblying the Power Cube in progress.

Revision as of 15:59, 26 August 2014

2014-07-16 (Wednesday):


 - 19:00: Arrival to MCI airport.
 - 21:00: Arrival to Factor eFarm.
 - 23:00: Sleep

2014-07-17 Thursday:


 - 9:00: Group meeting. Proposal to add a CVS like git to the OSE documentation system. We will probably use github.
 - 10:00: Teamwork to redesign the OSE documentation system.
 - 13:00: Video record to show the progress on documentation system.
 - 13:30: Lunch.
 - 14:30: Back to work. Made a power converter EU -> US.
 - 15:30: Continue with the redesign of the documentation and development system.
 - 19:20:
 - Adopting Trello for the DMAIC team.
 - Analyzing the existing documentation platform.
 - Setting up a infinoted test service, installing the gobby client, show it to the team.


2014-07-18 Friday:


- 9:30-13:30: Preparing the platform to code on the Arduino code for the CEB Press. - 14:30-17:30: Revieweing with Aidan the code of the CEB Press microcontroller. - 17:30-18:00: Visit to the Workshop. - 20:00-22:00: Working on the workshop. Start using the protection equipment. Some work on a tractor's piece.

2014-07-19 Saturday:


- 10:00-13:30: Preparing the arduino platform, visit to the workshop, first lines modified in the brick press' microcontroller code. - 14:30-16:30: Coding the CEB Press microcontroller. - 16:30-17:30: Helping out to take out some sand. - 17:30-20:00: Simplifying and fixing the firmware of the CEB Press microcontroller. -

2014-07-20 Sunday:


- Resting day.

2014-07-21 Monday


- Brick press team. Moving the head of the machine. - Grinding and welding during the whole afternoon. -

2014-07-22 Tuesday:


- Morning: Publicity team. - Afternoon: Workshop, handling steel bars for the Microhouse 3.

2014-07-23 Wednesday:


- The whole day: bending bars for the Microhouse 3. - Some welding practice.

2014-07-24 Thursday:


- Morning: Moving soil for the Microhouse 3. - Afternoon: Handling and measuring steel bars for the Microhouse.

2014-07-25 Friday: - Morning: Moving soil for the Microhouse 3. - Afternoon: Writting the next version for the CEB Press. Git repository: https://github.com/jaqm/Open-CEB-Press

2014-07-26 Saturday: - Resting day: relax, pool, more relax, some time writting code, more relax.

2014-07-27 Sunday: - The whole day: writting the firmware for the CEB Press. - Helping to move steel bars from the workshop to the microhouse.

2014-07-28 Monday: - Cleaning and reviewing the code for the CEB Press.

2014-07-29 Tuesday:

  • CEB Press firmware:
 - Review high pressure sensor flag support.
 - Review the auto-mode to make it fit the documentation. Reviewed the goToInitialPoint() sequence.
  • Cutting wood and wires for the MicroHouse.
  • Dragging the pool to solve the licks.

2014-07-30 Wednesday:

  • CEB Press firmware:
 - going deep more into details of the auto-mode algorithm.
  • Fixing the licks of the pool.

2014-07-31 Thursday:

  • Seeting up the testing CEB Press.
  • Pressing some bricks in the production Brick press.

2014-08-01 Friday:


  • Built a picnic table.
  • Taking pictures of the Velocar workshop.

2014-08-02 Saturday:


  • Helping to print parts for the battery of the Velocar during the whole day and part of the evening.

2014-08-03 Sunday:


  • Baked some bread.

2014-08-04 Monday:


  • Cleaning/organizing the buckets at the workshop.
  • Moving pallets and pieces of wood to cut.
  • Moving soil for the brick press.

2014-08-05 Tuesday:


  • Mounting the rollers for the Brick Pressing "Factory".
  • Helping in the Brick Pressing line: carrying buckets, moving bricks. Good exercise!

2014-08-06 Wednesday:


  • Cutting, pressing, drilling bars for the doms.

2014-08-07 Thursday:


  • Mounting doms.
  • Preparing the Microhouse Workshop.

2014-08-08 Friday:


  • Microhouse workshop starts.

2014-08-09 Saturday:


  • Carpintery: building modules.
  • Pressing bricks.

2014-08-10 Sunday:


  • Carpintery: building modules.
  • Pressing bricks.

2014-08-11 Monday:


  • Laying bricks.

2014-08-12 Tuesday:


  • Last day of the workshop.

2014-08-13 Wednesday:


  • Day off.

2014-08-14 Thursday:


  • Day off.

2014-08-15 Friday:


  • Assembling a structure to cover the microhouse.
  • Making work the pool pump.

2014-08-16 Saturday:


  • Group meeting.

2014-08-17 Sunday:


  • Melting alluminium.
  • First test of the new firmware on the CEB Press.
  • Adding new features and solving bugs on the new CEB Press firmware.

2014-08-18 Monday:


  • Tuning and solving bugs on the new CEB Press firmware.
  • Cutting steel tubes.
  • Cutting aluminum.
  • Taking a bunch of pictures of the Power cube and the Composting toilet stairs building process.
  • Taking down the dom.

2014-08-19 Tuesday:


  • Uploading the pictures I took yesterday.
  • Searching contact info of similar organizations to OSE to improve social networking.
  • Replacing the saw of the bendsaw.

2014-08-20 Wednesday:


  • Cutting aluminum.
  • Fixing the 3D-Printer, started to print little pieces for its self-improvement.

2014-08-20 Thursday:


  • Moving some boards to the old workshop.
  • Filtering and uploading pictures to trovebox fo the powercube documentation.
  • Found a Raspberry Pi. Set it up and now it's working on the "wireless" network.
  • Fixing the Rbick Press. We didn't finished so we will tray again the next day if's possible.

2014-08-21 Friday:


  • Rainy day.
  • Fixed the test controller board. There was another pin that wasn't working.
  • Improving and fixing a bug in the new brick press code.
  • Fixing the brick press.
  • Covering the microhouse to protect it against rain.

2014-08-21 Saturday:


  • Fixing the brick press.

2014-08-22 Sunday:


  • Fixing the brick press. The teensy and the fuse are broken.
  • Order a new Teensy for the Brick Press.
  • I finally publish the worklog.

2014-08-23 Monday:


  • Assemblying the CEB Press testing machine.
  • Assemblying the Power Cube in progress.