Door Requirement: Difference between revisions
Jump to navigation
Jump to search
(Created page with "*Door is only 7' high (same as wall) because of the height requirement of ceiling. *Door must be integrated into 1' thick CEB wall with stucco and 2" EPS insulation. *Bond bea...") |
No edit summary |
||
Line 2: | Line 2: | ||
*Door must be integrated into 1' thick CEB wall with stucco and 2" EPS insulation. | *Door must be integrated into 1' thick CEB wall with stucco and 2" EPS insulation. | ||
*Bond beam is directly above it. | *Bond beam is directly above it. | ||
*Finishing detail involves direct transition from door frame to stucco metal lath | *Finishing detail involves direct transition from door frame to stucco metal lath without need for any other trim |
Revision as of 01:34, 28 August 2014
- Door is only 7' high (same as wall) because of the height requirement of ceiling.
- Door must be integrated into 1' thick CEB wall with stucco and 2" EPS insulation.
- Bond beam is directly above it.
- Finishing detail involves direct transition from door frame to stucco metal lath without need for any other trim