MicroHouse 4 Foundation: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 4: Line 4:
*2"x10" forms
*2"x10" forms
*Stands 1-2" above floor
*Stands 1-2" above floor
*Includes concrete pad for stove and for bathroom
*Includes concrete pad for [[Hydronic Stove]] and for bathroom
*Provision must be made that CEB walls do not risk water damage in the event of house flooding via water leaks
*Provision must be made that CEB walls do not risk water damage in the event of house flooding via water leaks
*Foundation plan facilitates installation of CEB floor
*Foundation plan facilitates installation of CEB floor

Revision as of 16:05, 7 September 2014

Requirement

  • 1' wide stem wall
  • Shallow insulated footer
  • 2"x10" forms
  • Stands 1-2" above floor
  • Includes concrete pad for Hydronic Stove and for bathroom
  • Provision must be made that CEB walls do not risk water damage in the event of house flooding via water leaks
  • Foundation plan facilitates installation of CEB floor
  • Foundation plan facilitates installation of hydronic heating
  • Foundation plan facilitates installation of water and power lines in perimeter of floor