*Bond beam is directly above it. | *Bond beam is directly above it. | ||
*Finishing detail involves direct transition from door frame to stucco metal lath without need for any other trim | *Finishing detail involves direct transition from door frame to stucco metal lath without need for any other trim | ||
*Library North French Doors: left inswing (opening to the inside) | |||
*Utility South Door: right inswing (opening to the inside) | |||
*Utility East Door: right inswing (opening to the inside) |
Revision as of 15:05, 10 September 2014
- Door is only 7' high (same as wall) because of the height requirement of ceiling.
- Door must be integrated into 1' thick CEB wall with stucco and 2" EPS insulation.
- Bond beam is directly above it.
- Finishing detail involves direct transition from door frame to stucco metal lath without need for any other trim
- Library North French Doors: left inswing (opening to the inside)
- Utility South Door: right inswing (opening to the inside)
- Utility East Door: right inswing (opening to the inside)