(Created page with "To determine whether a product is ready to be produced in a successful workshop, here are some considerations? #What is the current build time? #How many units have been buil...") |
No edit summary |
||
Line 7: | Line 7: | ||
#What is the build preparation time for sourcing materials and preparing workshop documentation? | #What is the build preparation time for sourcing materials and preparing workshop documentation? | ||
#What is the material cost per unit? | #What is the material cost per unit? | ||
# | #What is the value of a comparable product purchased off the shelf? | ||
#Prior to workshop, how much time is required for (1) finding sourcing; (2) purchasing; (3) receiving; (4) inventorying; (5) precutting, pre-processing materials; (6) doing or outsourcing any other fabrication; (7) sourcing, preparing, and maintaining tools; (8) |
Revision as of 08:21, 14 April 2015
To determine whether a product is ready to be produced in a successful workshop, here are some considerations?
- What is the current build time?
- How many units have been built?
- What bugs exist in the design?
- What are the challenges during the build?
- What is the build preparation time for sourcing materials and preparing workshop documentation?
- What is the material cost per unit?
- What is the value of a comparable product purchased off the shelf?
- Prior to workshop, how much time is required for (1) finding sourcing; (2) purchasing; (3) receiving; (4) inventorying; (5) precutting, pre-processing materials; (6) doing or outsourcing any other fabrication; (7) sourcing, preparing, and maintaining tools; (8)