(Created page with "=Tools and Supplies= *Bobcat *Laser level *gravel *foundation forms - 2x10 lumber *rebar *rebar wire *Drill with 1/8" bit *Concrete - calling in a cement truck or get bags of...") |
No edit summary |
||
Line 18: | Line 18: | ||
*String | *String | ||
=Procedure= | =Procedure - Stem Wall Foundation= | ||
#Level and clear the site with a bobcat or bulldozer. | |||
#Grade the site such that the house is on a pad with drainage moving away from the house | |||
#Use a laser level or string level so that the elevation is equal throughout the footprint of the house to +/- 1" | |||
#Spread a truck load of gravel for the foundation so that it is 6" thick | |||
#Mark the 4 corners of the house at 16'1" (to accommodate 1/4" space between panels), roughly, such that the front of the house faces south | |||
#Connect all corners with string so that the 16'1" distance is maintained. | |||
#Adjust the 4 corners by declaring one side as fixed, then moving out the 16'1" length. Use string to fix the length at 16'1". Also use a string to connect the 2 adjusted corners, at 16'1" | |||
#Measure the diagonals. If they are not equal, shift the 2 adjusting corners, maintaining the 16'1" distance between all sides | |||
#Make sure the diagonals are equal +/- 1/4" | |||
#This now marks the outer edge of the foundation. | |||
#For the inner edge of the foundation, begin by putting in more stakes |
Revision as of 08:52, 22 May 2016
Tools and Supplies
- Bobcat
- Laser level
- gravel
- foundation forms - 2x10 lumber
- rebar
- rebar wire
- Drill with 1/8" bit
- Concrete - calling in a cement truck or get bags of concrete mix + cement mixer + water
- Cement mixer, water hose, buckets for carrying concrete
- 2x4 wood scree boards, 2' long
- Measuring tape
- wood forms
- [40] wood stakes for fastening the foundation
- 3" screws
- [16] 1/2" rebar stakes, 2.5' long
- Sill plate gasket (above foundation, below sill plate)
- String
Procedure - Stem Wall Foundation
- Level and clear the site with a bobcat or bulldozer.
- Grade the site such that the house is on a pad with drainage moving away from the house
- Use a laser level or string level so that the elevation is equal throughout the footprint of the house to +/- 1"
- Spread a truck load of gravel for the foundation so that it is 6" thick
- Mark the 4 corners of the house at 16'1" (to accommodate 1/4" space between panels), roughly, such that the front of the house faces south
- Connect all corners with string so that the 16'1" distance is maintained.
- Adjust the 4 corners by declaring one side as fixed, then moving out the 16'1" length. Use string to fix the length at 16'1". Also use a string to connect the 2 adjusted corners, at 16'1"
- Measure the diagonals. If they are not equal, shift the 2 adjusting corners, maintaining the 16'1" distance between all sides
- Make sure the diagonals are equal +/- 1/4"
- This now marks the outer edge of the foundation.
- For the inner edge of the foundation, begin by putting in more stakes