Car Startups: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "*Lucid Air - 1/4B for 20k production level, then to 1/2B for 50k production level, moving to 130k/year - [https://www.wired.com/story/lucid-tesla-wannabe-electric-sedan/?mbid=...")
 
No edit summary
 
Line 1: Line 1:
*Lucid Air - 1/4B for 20k production level, then to 1/2B for 50k production level, moving to 130k/year - [https://www.wired.com/story/lucid-tesla-wannabe-electric-sedan/?mbid=nl_120117_daily_list1_p2]
*Lucid Air - 1/4B for 20k production level, then to 1/2B for 50k production level, moving to 130k/year - [https://www.wired.com/story/lucid-tesla-wannabe-electric-sedan/?mbid=nl_120117_daily_list1_p2]
*Tesla - plans semis - 500 mi range at full load. 400 mi recharge in 1/2 hour.

Latest revision as of 02:26, 2 December 2017

  • Lucid Air - 1/4B for 20k production level, then to 1/2B for 50k production level, moving to 130k/year - [1]
  • Tesla - plans semis - 500 mi range at full load. 400 mi recharge in 1/2 hour.