MicroTrac v17.10 Build Data Collection: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 8: Line 8:
*Hose protectors installed.
*Hose protectors installed.
<html><iframe width="560" height="315" src="https://www.youtube.com/embed/wMJDVOzdlaU" frameborder="0" allow="autoplay; encrypted-media" allowfullscreen></iframe></html>
<html><iframe width="560" height="315" src="https://www.youtube.com/embed/wMJDVOzdlaU" frameborder="0" allow="autoplay; encrypted-media" allowfullscreen></iframe></html>
=Days=
*5. Shaft inserted, frame and motors are on. Second track is conncted. Power cube is inserted + arms. Quick attach plate is mounted. Cylinders are mounted.

Revision as of 02:26, 29 May 2018

  • Hand torching of drive sprockets worked
  • Entire machine was hand torched by multiple people with acceptable results:

  • Loader arms were fit in place on 3" solid CR shaft:

  • 14 people participated in build

  • Hose protectors installed.

Days

  • 5. Shaft inserted, frame and motors are on. Second track is conncted. Power cube is inserted + arms. Quick attach plate is mounted. Cylinders are mounted.