*Right side power line is not in use. It was installed from the huts to the old workshop initially, but was never used as the old workshop was off-grid on solar + Power Cubes in the early days. Since then the line was forgotten, and it may have been upearthed when the parking lot to the east of the new workshop was built. | *Right side power line is not in use. It was installed from the huts to the old workshop initially, but was never used as the old workshop was off-grid on solar + Power Cubes in the early days. Since then the line was forgotten, and it may have been upearthed when the parking lot to the east of the new workshop was built. | ||
*Water line going east is usable. It has never been put into service as of 2019, but should be for an RV campsite along with 200A service for RVs. | *Water line going east is usable. It has never been put into service as of 2019, but should be for an RV campsite along with 200A service for RVs. | ||
Revision as of 14:10, 3 October 2019
2019
2013 Water + DSL
Notes:
- Right side power line is not in use. It was installed from the huts to the old workshop initially, but was never used as the old workshop was off-grid on solar + Power Cubes in the early days. Since then the line was forgotten, and it may have been upearthed when the parking lot to the east of the new workshop was built.
- Water line going east is usable. It has never been put into service as of 2019, but should be for an RV campsite along with 200A service for RVs.