X 2020: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 3: Line 3:


=Visual Commit Protocol=
=Visual Commit Protocol=
==Contributions==
To facilitate ready awareness by hundreds of people on what every team member is doing, we use a [[Visual Commit Log]]:
To facilitate ready awareness by hundreds of people on what every team member is doing, we use a [[Visual Commit Log]]:
#It consists of an embedded Googgle presentation, OSE branded, and open for anyone to edit
#It consists of an embedded Googgle presentation, OSE branded, and open for anyone to edit
#Small screenshots are pasted to represent the most current work.
#Small screenshots are pasted to represent the most current work. Screenhot should be 50k or less of memory so document loads instantly.
#Each screenshot is hyperlinked to the source document or useful link.
#Each screenshot is hyperlinked to the source document or useful link.
#Entries are made on the top page of the Google Presentation
#Entries are made on the top page of the Google Presentation
#New pages are brought to the top so that current work is at the top, for immediate access without scrolling down
#New pages are brought to the top so that current work is at the top, for immediate access without scrolling down
#This window is embedded in the Summer X Dashboard / Control Room below.
#Not all entries are necessarily logged this way. Less prominent contributions are simply logged in one's [[Work Log]]


=Participants=
=Participants=

Revision as of 00:23, 13 February 2020

About

We are creating a dashboard/control center for 100+ people collaborating over the Summer X 2020 program. The ideas is to facilitate building upon everyone's contributions.

Visual Commit Protocol

Contributions

To facilitate ready awareness by hundreds of people on what every team member is doing, we use a Visual Commit Log:

  1. It consists of an embedded Googgle presentation, OSE branded, and open for anyone to edit
  2. Small screenshots are pasted to represent the most current work. Screenhot should be 50k or less of memory so document loads instantly.
  3. Each screenshot is hyperlinked to the source document or useful link.
  4. Entries are made on the top page of the Google Presentation
  5. New pages are brought to the top so that current work is at the top, for immediate access without scrolling down
  6. This window is embedded in the Summer X Dashboard / Control Room below.
  7. Not all entries are necessarily logged this way. Less prominent contributions are simply logged in one's Work Log

Participants

Marcin Log - Jeff Log

X Collaboration Dashboard


Video Log



Links

  1. OSE Workshops FB Page
  2. Work Logs
  • <a href="/wiki/Summer_of_Extreme_Design-Build_2020" title="Summer of Extreme Design-Build 2020">Summer of Extreme Design-Build 2020</a>