Geodesic Dome Workflow: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Moved some stuff around)
(Fixed an internal link)
Line 14: Line 14:
==Assembly Planning + Part Manufacturing==
==Assembly Planning + Part Manufacturing==
*Assemble all [[Geodesic Dome Structual Beam]]s and [[Geodesic Dome Connector]]s and [[Geodesic Dome Structual Panel]]s needed (Either by hand, [[CNC Torch Table]] / [[CNC Mill]] , [[3D Printer]] or [[Precious Plastic]] machines
*Assemble all [[Geodesic Dome Structual Beam]]s and [[Geodesic Dome Connector]]s and [[Geodesic Dome Structual Panel]]s needed (Either by hand, [[CNC Torch Table]] / [[CNC Mill]] , [[3D Printer]] or [[Precious Plastic]] machines
*Download/Make a [[Language Agnostic Tutorial]] and any other instructions needed
*Download/Make a [[Language Agnostic Instructions]] and any other instructions needed
*Assemble the team needed (If any)
*Assemble the team needed (If any)
*Plan a Build Day/Event
*Plan a Build Day/Event

Revision as of 03:25, 28 February 2020

Basics

  • This page goes over a (Currently planning stage) workflow for designing custom Geodesic Domes easily with full OSE software and hardware integration

Workflow

Step 1: Planning

Step 2: CAD + Designing

Assembly Planning + Part Manufacturing

Building

Quality Control

  • Check for Leaks if needed
  • Check for errors

See Also

Useful Links