CEB Press/Manufacturing Instructions/Frame with main cylinder: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 5: Line 5:


== Materials Required ==
== Materials Required ==
[[Image:channel.jpg|thumb]]
*6 inch heavy (7/16") u-channel - ( 20 ft )
*6 inch heavy (7/16") u-channel - ( 20 ft )
*bolts
*bolts
*3”x3”x1/2” (8) (cylinder mounts for both cylinders)
*3”x3”x1/2” (8) (cylinder mounts for both cylinders)
*1” shaft, 6” long (main cylinder mount)
*1” shaft, 6” long (main cylinder mount)


Line 21: Line 18:


== Fabrication Steps ==
== Fabrication Steps ==
[[Image:punchedholes.jpg|thumb| Step 2]]
===Step 1: Cut pieces===
[[Image:Framestanding.jpg|thumb| Step 3]]
1. [[Image:channel.jpg|thumb|Step 1. Torch or cold-cut channel to size]]
 
1. Torch or cold-cut channel to size
*2 pieces, 40 3/4"
*2 pieces, 40 3/4"
*4 pieces, 18"
*4 pieces, 18"
Line 32: Line 27:
*2 pieces 1/4”x10”x18” (bent 1.5” off the edge the long way)
*2 pieces 1/4”x10”x18” (bent 1.5” off the edge the long way)


===Step 2: Punch holes===
[[Image:punchedholes.jpg|thumb|Step 2]]


2. Punch holes
===Step 3: Bolt pieces together===
 
[[Image:Framestanding.jpg|thumb| Step 3]]
3. bolt together
 
4. Prepare Hydraulic Cylinder


5.
===Step 4: Prepare Hydraulic Cylinder===

Revision as of 19:54, 24 April 2011

Tools Required

  • torch
  • hole punch

Materials Required

  • 6 inch heavy (7/16") u-channel - ( 20 ft )
  • bolts
  • 3”x3”x1/2” (8) (cylinder mounts for both cylinders)
  • 1” shaft, 6” long (main cylinder mount)

Diagram and video explantion

Feflibframe.jpg


Fabrication Steps

Step 1: Cut pieces

1.

Step 1. Torch or cold-cut channel to size
  • 2 pieces, 40 3/4"
  • 4 pieces, 18"
  • 2 pieces, 26"

bend:

  • 2 pieces 1/4”x10”x18” (bent 1.5” off the edge the long way)

Step 2: Punch holes

Step 2

Step 3: Bolt pieces together

Step 3

Step 4: Prepare Hydraulic Cylinder